Maintenance and Replacement of Electromagnetic Valve of Vacuum Oil Filter

2019/8/1??????view:

  Maintenance of the solenoid valve of the vacuum oil filter. This component is mounted on the pump. Its air ballast is driven by the solenoid valve for 24VDC.

  When the air ballast valve is opened and operates at normal temperature, SOGEVAC's capacity of pumping steam can reach the maximum water vapor resistance in the technical parameters for pure water vapor. When the working temperature rises, the vapor limit of the pump also increases.

  Open the air ballast valve with a single screw batch. When the ballast valve is opened, the noise of the pump increases slightly. Before the pump is ready to extract steam, the air ballast valve must be opened under the closure of the intake port, and the pump will run for about 30 minutes to preheat.

  Important Notes

  Only when the pump is preheated to the working temperature can the inlet valve be opened to extract condensable steam, because the process gas pumped by the cold pump will condensate the steam into the oil.

  In the process of high content condensing steam evacuation, the intake pipe should be opened slowly after the working temperature is reached to prevent excessive steam from entering the pump.

  One of the phenomena of steam condensation in pumps is the increase of oil level during pump operation.

  During the evacuation process, the steam can be dissolved in the oil. This will change the characteristics of oil and cause pump corrosion. Therefore, do not stop the pump immediately after the end of the pumping process. Instead, the intake pipeline is closed to allow the pump to continue operating under the open air ballast until there is no condensate gas in the oil. We recommend that it should run in this way for about 30 minutes after the end of the evacuation process.

  Be careful:

  In the process of cyclic evacuation, do not stop the pump during the gap between the two evacuation processes, but should close the intake port, perhaps through the valve to achieve. Open the ballast valve to keep it running.

  When the pump operates under the limit pressure, the power consumption is very small.

  Once all the steam is removed from the process (e.g. vacuum drying), the air ballast valve can be closed to improve the limit pressure.

  Cyclic work

  We emphasize that to limit the number of pump start-ups, it should be 5 or 6 times per hour.

  If the process requires periodic operation, we recommend the use of pneumatic solenoid valve control, so that the pump works continuously.

  In general, the pump should be stopped after all the work is completed.

  The inlet of SOGEVAC is equipped with an anti-return oil valve. When the pump is powered off, it closes the inlet, thus keeping the connected system vacuum and preventing oil from returning to the system. Gas ballast does not hinder the function of the valve.

  When the condensable medium is exhausted, the air ballast valve should be opened before the pump is powered off, and the intake pipe should be closed to allow the pump to continue to operate (see Section 2.5.2).

  warning

  If the pump has to be stopped for a long time or if it has to be stored, please follow the following steps.

  When evacuating harmful substances, appropriate safety measures should be taken.

  Fill in clean oil to the lower edge of the oil level observation window and let the pump run for a few minutes.

  Then the oil is released, and the clean oil is poured into the upper edge of the oil level observation window.

  Close the connection. No anti-corrosion oil is required.

  warning

  When the pump is powered off due to overheating caused by the motor or its temperature detector, the pump must be cooled to the ambient temperature and the cause of overheating can be eliminated before starting manually again.

  After power failure, in order to prevent accidental start of the pump, the pump must be connected with a control system so that it can only be started by manual switch. This is also applicable to emergency circuit breakers.

  If switching the process related to the preheated pump under working conditions, remember that the pump can not be started directly again.

  Limit pump pressure

  If the system can not meet the pressure specified in the technical data, the pump will be removed from the system and the limit pressure will be measured directly at the pump suction port.

  The limit pressure (air partial pressure) of non-condensable gases can only be measured with a compressed vacuum gauge or a pressure gauge. Accurate measurement data can only be obtained with calibrated instruments.

  When the pump is first started after a long period of idleness or oil replacement, it will take some time to reach the prescribed limit pressure. Because the pump must reach its working temperature, the pump oil must be degassed. We recommend opening the air ballast valve for the first start-up pump.

  Limit pressure depends on pump temperature and the pump oil used. Using the recommended oil, the best limit pressure can be obtained at low pump temperature.


主站蜘蛛池模板: 亚洲精品亚洲人成在线麻豆 | 久章草视频 | 国产在线不卡免费播放 | 亚洲视频一区二区在线观看 | 日韩 国产 欧美 | selaoban在线视频免费精品 | 成人午夜免费观看 | 青青热在线精品视频免费 | 国产xh98hx在线观看 | 国内国外精品一区二区 | 成人永久免费视频网站在线观看 | 欧美真人毛片动作视频 | 欧美在线一级毛片视频 | 国产一区二区在线免费观看 | 日本免费的一级绿象 | 日韩精品免费视频 | 日韩三级在线播放 | 欧美三级日韩 | cao在线视频 | 欧美日韩加勒比一区二区三区 | 狠狠色丁香婷婷久久综合考虑 | 日日摸天天摸狠狠摸视频 | 在线观看不卡一区 | 国产成人lu在线视频 | 成年人在线观看网站 | 国产精品国三级国产aⅴ | 国产精品黄页在线播放免费 | 黄色三级网址 | 欧美亚洲国产精品久久久 | 欧美国产综合在线 | 深夜爽爽福利gif在线观看 | 日本欧美精品 | 草草久久97超级碰碰碰免费 | 点击进入不卡毛片免费观看 | 亚洲日本高清 | 久久免费大片 | 精品午夜一区二区三区在线观看 | 成人免费毛片一区二区三区 | 欧美日韩在线永久免费播放 | 欧美性色一级在线观看 | 日本特黄特色大片免费看 |