久久久91精品国产一区二区三区-久久久9999久久精品小说-久久久999久久久精品-久久久www成人免费精品-亚洲色图在线观看-亚洲色图自拍

Your Position: Home > Support > FAQ

Installation of Safety Gas Ballast Valve for Vacuum Oil Filter

2019/8/1??????view:

  Installation of selected ballast valves

  SOGEVAC SV200-300 with air ballast valve or SOGEVAC SV200-300 without air ballast valve can be selected according to customers'requirements. Gas ballast valves also have various models.

  Remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94), and remove the cover.

  Put the oil out.

  Remove screw (6/13) and gasket.

  Install the selected air ballast valve (6/14) with bolts and gaskets.

  Re-fitting and oil filling.

  Note:

  LEYBOLD USA sells pumps, standard air ballast valves are standard equipment.

  Repair

  warning

  Cut off the power supply before removing the pump. It must be absolutely guaranteed that the pump can not start accidentally.

  warning

  If the pump has pumped harmful substances, it is necessary to understand the nature of the hazards and take appropriate safety measures.

  Comply with all safety regulations.

  Maintenance of LEYBOLD Maintenance Station

  If you send the pump to LEYBOLD maintenance station, please indicate whether the pump has any substances harmful to human health, or whether it is contaminated. If the pump has been polluted, the nature of the hazard must be explained. For this purpose, you must use the form we have prepared, which will be provided to you as required.

  At the end of the instruction sheet, there is a copy of the form "Instructions for Contamination of Vacuum Equipment and Components".

  Please attach this form to the pump or pack it with the pump. This description is needed to meet the requirements of regulations and protect our staff.

  If there is no "pollution instructions", the LEYBOLD maintenance station will return the received pump to the shipper's address.

  warning

  The packing of the pump must be guaranteed that the pump will not be damaged during transportation, so that harmful substances will not spill over from the packing box.

  If you turn on the pump in your own factory, also pay attention to whether there is pollution.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations.

  According to the design idea, the SOGEVAC pump needs very little maintenance under normal working conditions. The required maintenance work is described in the next section.

  All work must be performed by trained personnel. Improper maintenance or overhaul will affect the life and performance of the pump, and affect the claim for warranty.

  Daily maintenance system

  The maintenance frequency described in the daily maintenance system is the approximate value of the normal operation of the pump. Maintenance times should be increased under adverse environmental conditions and/or corrosive media conditions.


主站蜘蛛池模板: 亚洲国产tv | 亚洲欧洲国产成人精品 | 91色老99久久九九爱精品 | 在线观看香蕉免费啪在线观看 | 亚洲精品国自产拍在线观看 | 国产毛片久久国产 | 国产午夜人做人视频羞羞 | 美女张开腿让男人桶爽动漫视频 | 国产区高清 | 久久精品一区二区国产 | 美女和男人免费网站视频 | 亚洲美女爱爱 | 亚洲第一视频在线观看 | 久久99国产精品久久99无号码 | 在线成人播放毛片 | 美女视频免费永久观看的 | 国内精品久久久久久久久久影视 | 日韩午夜在线视频不卡片 | 岛国在线永久免费视频 | 特级a欧美做爰片毛片 | 一区二区三区在线观看免费 | 亚洲成人看片 | 国产亚洲精品激情一区二区三区 | 午夜无遮挡怕怕怕免费视频 | 日本一级级特黄特色大片 | 亚洲精品高清国产一线久久97 | 亚洲毛片免费视频 | 中文字幕在线播放 | 8888奇米四色在线 | aaaaaa精品视频在线观看 | 久久午夜鲁丝片午夜精品 | 91热久久免费精品99 | 美国三级视频 | 毛片a片免费观看 | 一本综合久久 | 中文字幕一区日韩在线视频 | 最新亚洲一区二区三区四区 | 国产aⅴ一区二区三区 | 亚洲久久网站 | 久视频在线 | 亚洲第四页 |